Projects
Wiener Netze GmbH
Three control centres for monitoring and controlling the gas load distribution, medium voltage and high voltage supply for over 2 million customers in the Vienna area.
- Multiple large-screen displays and operations manager workstations spread over the various centres
- Conference and crisis management room with interactive LCD displays, visualizer and video wall
- Stately KVMA solution for all control centres, crisis management room and conference
- Integration of building management functions and alarms into the operating system
- Sound system
(Pictures: © Wiener Netze GmbH / General planning: Ergoconcept Engineering GmbH)